GCL Case Studies

GCL have a long history working across multiple sectors either directly or in partnership with Main Contractors. If you would like more information about your sector, contact us today. Recent case studies:


UCL---New-logoUniversity College London

Voice (VoIP) wired network and wireless connectivity, linked to other buildings on the university campus for 750 people.

Read the case study


highgateLogo2Highgate Hospital

Providing efficient Intra-Structure services for a new state-of-the-art two-story extension for North London Hospital.

Read the case study


Server roomUK Data Centre

In order to achieve Tier III status on its incoming electrical supplies, GCL improve the resilience of their LV power supplies at UK Data Centre.

Read the case study


Monarch-CourtMonarch Court

GCL assisted their client convert a former old people’s home into a modern 86 bedroom youth hostel. Including CCTV, with a fully net-workable 64 channel digital recording suite and new fire alarm system with 200 Apollo heat and smoke detectors.

Read the case study


Moor-house-entrance-lobbyEntrance lobby at Moor House

GCL sourced and manufactured bespoke LED luminaires to reduce lobby lighting costs by 89% in this 300,000 square foot Central London building.

Read the case study


Moor-house-lift-carLift cars at Moor House

Changing all lift car luminaires to LEDs saves GCL’s client 55% per year in lift lighting costs for this prestigious Central London office building.

Read the case study


Moor-house-stair-wellsStairwells at Moor House

GCL reduces stairwell running costs by 70% by installing mircowave sensor controlled, energy efficent LED’s for this prestigious 21-storey office building.

Read the case study


For more information on our building technologies and services, please contact one of our experts now on 0845 6000 919.